Skip to main content

Slashdot: Prosecutors Were Already Investigating Whether Boeing Provided 'Incomplete or Misleading' 737 Information

Prosecutors Were Already Investigating Whether Boeing Provided 'Incomplete or Misleading' 737 Information
Published on April 01, 2019 at 02:04AM
Fox Business News reports: - "Federal prosecutors are investigating whether Boeing provided incomplete or misleading information about its best-selling 737 Max aircraft to U.S. air safety regulators and customers, according to a report from The Wall Street Journal." - That investigation began five months ago -- after the first crash that killed 189 people, but before the second one. Nine days after that November 7 crash, America's Federal Aviation Administration had issued an international emergency order "warning that Boeing had discovered an 'unsafe condition' that is 'likely to exist or develop' in other planes," reports the Washington Post: The FAA directive said if erroneous data is received by the 737 Max jet's flight control system, the plane's nose could be pushed down repeatedly. Failing to address that "could cause the flight crew to have difficulty controlling the airplane," push the nose down and lead to "significant altitude loss, and possible impact with terrain," according to the notice. The notice told pilots that, if bad data causes problems to appear, they should "disengage autopilot" and use other controls and adjust other switches to fly the plane.... Investigators scouring black box data believe an automatic anti-stalling feature was engaged before a Boeing 737 Max jet crashed and killed 157 people in EthiÂoÂpia, an administration official said Friday. The feature, known as MCAS, also was a factor in the October crash in Indonesia, according to investigators. The investigators said inaccurate information from an outside sensor led MCAS to force the nose of the plane down over and over again. That explanation is also supported by the positioning of equipment on the aircraft's tail "in a way that would push the plane's nose downward, consistent with the black box finding," reports the Washington Post. Fox Business also reports that Boeing currently has over 4,600 "unfilled" orders for its 737 Max jets.

Read more of this story at Slashdot.

Comments

Popular posts from this blog

Slashdot: AT&T Says Leaked Data of 70 Million People Is Not From Its Systems

AT&T Says Leaked Data of 70 Million People Is Not From Its Systems Published on March 20, 2024 at 02:15AM An anonymous reader quotes a report from BleepingComputer: AT&T says a massive trove of data impacting 71 million people did not originate from its systems after a hacker leaked it on a cybercrime forum and claimed it was stolen in a 2021 breach of the company. While BleepingComputer has not been able to confirm the legitimacy of all the data in the database, we have confirmed some of the entries are accurate, including those whose data is not publicly accessible for scraping. The data is from an alleged 2021 AT&T data breach that a threat actor known as ShinyHunters attempted to sell on the RaidForums data theft forum for a starting price of $200,000 and incremental offers of $30,000. The hacker stated they would sell it immediately for $1 million. AT&T told BleepingComputer then that the data did not originate from them and that its systems were not breached. &q

Slashdot: AT&T, T-Mobile Prep First RedCap 5G IoT Devices

AT&T, T-Mobile Prep First RedCap 5G IoT Devices Published on October 15, 2024 at 03:20AM The first 5G Internet of Things (IoT) devices are launching soon. According to Fierce Wireless, T-Mobile plans to launch its first RedCap devices by the end of the year, while AT&T's devices are expected sometime in 2025. From the report: All of this should pave the way for higher performance 5G gadgets to make an impact in the world of IoT. RedCap, which stands for reduced capabilities, was introduced as part of the 3GPP's Release 17 5G standard, which was completed -- or frozen in 3GPP terms -- in mid-2022. The specification, which is also called NR-Light, is the first 5G-specific spec for IoT. RedCap promises to offer data transfer speeds of between 30 Mbps to 80 Mbps. The RedCap spec greatly reduces the bandwidth needed for 5G, allowing the signal to run in a 20 MHz channel rather than the 100 MHz channel required for full scale 5G communications. Read more of this story at

Slashdot: AT&T Can't Hang Up On Landline Phone Customers, California Agency Rules

AT&T Can't Hang Up On Landline Phone Customers, California Agency Rules Published on June 22, 2024 at 01:50AM An anonymous reader quotes a report from Ars Technica: The California Public Utilities Commission (CPUC) yesterday rejected AT&T's request to end its landline phone obligations. The state agency also urged AT&T to upgrade copper facilities to fiber instead of trying to shut down the outdated portions of its network. AT&T asked the state to eliminate its Carrier of Last Resort (COLR) obligation, which requires it to provide landline telephone service to any potential customer in its service territory. A CPUC administrative law judge recommended rejection of the application last month, and the commission voted to dismiss AT&T's application with prejudice on Thursday. "Our vote to dismiss AT&T's application made clear that we will protect customer access to basic telephone service... Our rules were designed to provide that assurance,